!

From Saturday, May 25, 2024, daily operation with the Bad Ragaz-Pardiel gondola lift.

close

Search field Training area with avalanche transceivers

When someone is buried by an avalanche, every minute counts. That's why everyone should have a perfect command of their avalanche transceiver.

The approx. 100×100 m training facility at the Gaffia station is permanently installed and accessible free of charge throughout the winter. If you don't have your own test equipment, you can hire it for a deposit at the top station of the Furt-Gaffia chairlift.